sp16 WEEK 13: SITE VISIT
Saturday April, 16 Webster site visit: We are leaving from AME at 11:00 am, be to studio by 10:45 so we can load up tools for the trip. DRESS ACCORDINGLY! We will be outside, with a possibility of rain.
sp16 WEEK 13: SITE VISIT
Saturday April, 16 Webster site visit: We are leaving from AME at 11:00 am, be to studio by 10:45 so we can load up tools for the trip. DRESS ACCORDINGLY! We will be outside, with a possibility of rain.

sp16: WEEK 11: GAGE BROTHERS VISIT
The class on Tuesday visited Gage Brothers, to help them understand the overall casting process of precast concrete as well as the workflow for casting a girder; from pre-stressing to hauling the beam off site.

sp16: WEEK 11: GAGE BROTHERS VISIT
The class on Tuesday visited Gage Brothers, to help them understand the overall casting process of precast concrete as well as the workflow for casting a girder; from pre-stressing to hauling the beam off site.

sp 16 WEEK 10: SLEEVE PROTOTYE
With the new groups, the class is continuing to explore fabrication assemblies for the steel angle sleeve that will hold up the benches and sleds; along with beginning to understand the construction sequence of the beam from Gage Brothers to

sp 16 WEEK 10: SLEEVE PROTOTYE
With the new groups, the class is continuing to explore fabrication assemblies for the steel angle sleeve that will hold up the benches and sleds; along with beginning to understand the construction sequence of the beam from Gage Brothers to

sp 16 WEEK 9: SLEEVE AND BEAM PROTOTYPING
For Tuesday I have to have the most recent, completed sleeve prototype. This needs to be a complete figuration, by this I mean I should not have to ask any questions about how the pieces attach and what type of

sp 16 WEEK 9: SLEEVE AND BEAM PROTOTYPING
For Tuesday I have to have the most recent, completed sleeve prototype. This needs to be a complete figuration, by this I mean I should not have to ask any questions about how the pieces attach and what type of

sp 16 WEEK 9: MOCK UP UPDATE
For Tuesday as a class the full scale beam mock up updates need to be completed; This includes assembling the new footing, bolt connections for the sleeve both on top and on the side of the beam.

sp 16 WEEK 9: MOCK UP UPDATE
For Tuesday as a class the full scale beam mock up updates need to be completed; This includes assembling the new footing, bolt connections for the sleeve both on top and on the side of the beam.

sp16 FOR REVIEW(02/23/16)
midreview.layout.02.23.16 Attached is the layout for the documentation of the benches please follow this precisely so we can have proper organization.

sp16 FOR REVIEW(02/23/16)
midreview.layout.02.23.16 Attached is the layout for the documentation of the benches please follow this precisely so we can have proper organization.

sp16 WEEK 6: 1/2″ Model
For the review on Tuesday (02/23) have the following completed and or printed by 1:00 PM. CAST BEAMÂ with the following: Benches, brick wall sled, sleeves for all benches and brick wall sleeve. 30″ on center weld plates, footing positions, crane

sp16 WEEK 6: 1/2″ Model
For the review on Tuesday (02/23) have the following completed and or printed by 1:00 PM. CAST BEAMÂ with the following: Benches, brick wall sled, sleeves for all benches and brick wall sleeve. 30″ on center weld plates, footing positions, crane

sp16 WEEK 6: MODEL WORK
Continue work on the girder and sleeve models for Thursday. SDSU_Arch_Webster

sp16 WEEK 6: MODEL WORK
Continue work on the girder and sleeve models for Thursday. SDSU_Arch_Webster